EV home charging · Coventry
Can you charge an EV without a driveway in Coventry?
Coventry publishes two distinct home-to-street charging trials. Its current Trojan Home page links to provider pre-registration for a trial capped at 20 installations, with no upfront installation charge but a £50 monthly subscription for 36 months. The older gully trial page gives an elapsed 2025/26 end date and does not establish an open general gully application.
Check your postcode and property →Your practical route
What to do next in Coventry
The correct order matters: do not buy a channel or arrange pavement work before the authority confirms the route.
- Choose the correct Coventry trialThe Trojan Home route uses a flat pavement charging unit powered from the household supply. It is different from the self-closing cable-gully trial described on the council’s previous page.
- Check capacity and the commitmentThe Trojan page advertises first-come, first-served places, capped at 20 installations. Confirm a place and read the 36-month subscription terms; £50 a month totals £1,800 before electricity.
- Obtain individual installation approvalUse the provider pre-registration form linked by the council and wait for its survey and acceptance. Registration is not a confirmed place. The council says Trojan installs and maintains the equipment on its behalf; do not arrange private pavement works.
- Confirm what follows the trialThe council expects the Trojan trial to conclude by the end of the 2026/27 financial year, while also describing a minimum 12-month trial and a 36-month subscription. Ask how those periods affect your start date, continuation and cancellation rights before signing.
Official source
Confirm the current council position
Coventry publishes two distinct home-to-street charging trials. Its current Trojan Home page links to provider pre-registration for a trial capped at 20 installations, with no upfront installation charge but a £50 monthly subscription for 36 months. The older gully trial page gives an elapsed 2025/26 end date and does not establish an open general gully application.
Source last checked: 3 November 2026. This independent guide cannot grant highway permission or reserve a parking space.