EV home charging · Devon
Can you charge an EV without a driveway in Devon?
The joint Devon and Torbay cable-channel trial has concluded. Devon is evaluating the results and says normal business-as-usual applications are anticipated from early 2027, so no current household application should be submitted.
Check your postcode and property →Your practical route
What to do next in Devon
The correct order matters: do not buy a channel or arrange pavement work before the authority confirms the route.
- Wait for the evaluated schemeThe former free trial is closed. Watch the official page for the early-2027 application route, eligibility rules and resident price.
- Keep the property evidence readyFuture applications are expected to remain aimed at households without off-street parking and will still require a suitable highway location.
- Do not reuse the trial formThe old trial material records how the pilot worked; it is not evidence that a new channel can currently be ordered.
Official source
Confirm the current council position
The joint Devon and Torbay trial has concluded and its findings are being evaluated before a wider service is introduced.
Source last checked: 21 October 2026. This independent guide cannot grant highway permission or reserve a parking space.